

The same software that runs our network is available for your chargers. Monitor live status, set tariffs, manage users and RFID cards, see revenue reports and get instant fault alerts — on any OCPP 1.6 / 2.0.1 compatible charger.
What you get
OCPP 1.6J & 2.0.1
Live charger status & alerts
Dynamic tariffs
User
RFID & fleet management
Revenue & energy reports
White-label app option
Common questions
Park, plug the connector into your vehicle and start the session by scanning the QR code on the charger, tapping your RFID card or using the Power Kothi app. Pay with UPI, card or wallet — the session stops automatically at your chosen limit or when you unplug.
All cars with CCS2 (DC) or Type 2 (AC) connectors — which covers most electric cars sold in India — plus two- and three-wheelers at stations with Bharat AC001 / 15A points. Each station page lists its connectors.
On a 60 kW DC charger most cars go from 10% to 80% in about 40–45 minutes; on 120–240 kW chargers it can be 25–30 minutes. AC charging at 7.4 kW takes 5–8 hours for a full charge, which is ideal overnight.
You pay per kWh of energy used. Current prices are shown on every station page and on the charger screen before you start. Use the calculator on our home page to estimate your cost.
Explore other services
Public Fast Charging Hubs
DC fast chargers in city centres, malls and markets — open 24×7 with live availability.
Learn moreHighway Charging Corridors
Fast chargers every 50–80 km on major highways and expressways.
Learn moreFleet & E-Bus Charging
Depot charging, smart scheduling and energy reports for cabs, delivery and buses.
Learn moreHome Charger Installation
Smart 3.3 / 7.4 kW home chargers — site survey, wiring and installation done for you.
Learn more
